Transmission Line Steel Angle Cross Arm Channel Pole Line Hardware Fisher Plates 3 Holes Transformer Platforms, U
Basic Info.
Model NO. | BD-CA-2114 |
Produce Time | Goods Are Delivered Within 30 Days |
Sample Time | Samples Are Confirmed Within 7 Days |
Unloading Idea | Each Pks Free Providing Two of Sling for Unloading |
Processing | Cutting, Punched Holes, Welding, Galvanize |
Surface | Hot DIP Galvanized More Than 85um(600g)/M2 |
Section | L, U, I, H or Customized Welding Sections |
Transport Package | Standard Shipping Packaging or as Customized |
Specification | Grade: q235; q355, Size customized as drawing |
Trademark | BD or customized logo |
Origin | Tangshan City of China |
HS Code | 8535900090 |
Production Capacity | 65000/Mouth |
Product Description
Transmission Line Steel Angle Cross arm Channel Pole line hardware
Product Description
The power parts is applied to the pole or tower to support the main component of the power transmission cable. Main including Electric cross arm,Electric pole Hoop,Electric bracket and Transformer Fence . According to the customer's drawing requirements, it is made of specific steel through cutting, welding, perforating, bending and other processes, and hot-dip galvanized anti-corrosion treatment is done after completion, so that the power crossarm will not rust in open air use and keep long time using life.
Client's Common Request&Worried | Our advantage |
Need good price | Base on standard and material not changed, we are providing our very nice price to support client, that's for long time cooperation.We are sure that our price is definitely lower than that of most of theelectronic product suppliers based on the same quality |
Short delivery time to save fund interest | Common Delivery time will keep 30 days, this based on order quantity and material situation. If urgent, delivery time can discuss.it's no problem. |
Whether can providing sample to confirm quality | No problem, As confirm drawings, we can doing samples to you confirm within 7 days |
Are you can design drawings as request | Yes, when clear your request, there can arrange Designer to designing drawings as your request to your confirm within 3 days , and then to produce. And same time,we also have professional person to re-check drawing if your original drawings have problem,will take time to discuss with you to Revise it within 3days |
Are you have certificate for cargos quality | We have ISO,SGS of factory certificate, and shipment will providing Mill Test certificate, and if you need, also can arrange third party test, we support your work to confirm cargo good. |
Logo &Label | As request to providing Logo & Label, three types for choose, one is sticker for each pcs with your request information; second is lag for each bundles; third is Stencil for each pcs, follow have pictures for your check and choose |
Packages | Standard Sea shipment Packages, If have request or drawings using by matching Set not pcs, will Packing as Set to arrange Packages, easy for your Matching set when shipment Reached |
Payment terms | T/T,L/C and others to discuss |
three types for choose:
One is sticker for each pcs with your request information; Second is lag for each bundles; Third is Stencil for each pcs, Detail please check follow
Besides conform to the drawing and design, the materials and fabrication of tower & Electric cross arm components shall conform to the Chinese Standard or other standard which clients can accept.1. GB/T2694-2003 Transmission line tower - - Technical requirements for manufacturing2. JGJ81-2002: Technical specification for welding for steel structure of building3. GB9787-88: Measuring and allowable tolerance for hot-rolled equal angle4. GB709-88: Measuring and allowable tolerance for hot-rolled plate and strip5. GB/T699-1999: Quality Carbon Structural Steel6. GB/T1591-1994: Low alloy high strength structural Steel7. GB700-88: Carbon Structural Steel8. GB222-84: Method of sampling steel for determination of chemical composition and permissible variations9. GB/T228-2002: Method for Tensile testing of metals10 GB/T232-1999: Method for Bending test of metals11 GB/T5117-1995: Carbon Welding Rod12 GB/T5118-1995: Low Alloy Welding Rod13 GB/T8110-1995: Welding wires for gas shielding arc welding of carbon and low alloy steels14 GB/T10045-2001: Carbon steel flux cored electrodes for arc welding15 JB/T7949-1999: Weld outer dimensions for steel construction16 GB50205-2001: Test Standard for Acceptance of Steel Structure17 GB/T470-1997: Zinc Ingot18 GB3098.1-2000: Mechanical properties of fasteners-Part 1: Bolts, screws and studs19 GB3098.2-2000: Mechanical properties of fasteners-Part2: Nuts, and thread20 GB3098.3-2000: Mechanical properties of fasteners-Part3: Fastening screw21 GB/T5780-2000: Helical Bolts Grade C22 GB/T41-2000: Helical Nuts Grade C23 GB/T90-2002: Flat Washer Grade C24 GB/T13912-2002: Metal Coating, Technical Requirement
Tangshan Dongfang Baode Trading Co., Ltd. is an international trading company of Tangshan Fuhaixin Iron and Steel Group. Now mainly working in the processing service and supply of steel products at home and abroad. The group has 4 factories,mainly producing Deformed steel rebar, U channel, Angle steel, H steel beam etc of steel structure raw materials products, directly providing Dongfang Baode Trading Co., Ltd. with high-quality raw materials and fast feed services, ensuring high-quality products and professional The processing service is the most perfect combination, the first time to give customers the most powerful backing support.
In addition, Orient Baode has also cooperated with a number of processing companies in depth, and has given professional guidance and suggestions based on customers' purchase intentions and processing purposes, and actively solved the difficulties in customer procurement and use. The finished picture is for customers to choose.
Now Dongfangbaode can accept customers' drawings, samples, samples and other customized processing services. The products include: solar brackets, steel structure main body, power cross arm hoop accessories, ground piles Fence and many other products with processing requirements. And the principle of "high quality, low price and fast delivery". Strive to ensure that drawings are confirmed within 3 days, samples are confirmed within 7 days, and finished goods are delivered within 30 days.The monthly export volume is more than 800 tons, which has won the favor of most customers in Africa, the Middle East and Australia.
Warmly welcome customers at home and abroad for inspection and guidance, and is willing to cooperate with you for a win-win situation!